Assume nothing, check everything, trust no one, get it in writing!
Forecast:
Unemployment is going to get worse, reaching 9% by the end of the year. For buy & hold, invest in low-medium bracket, because if people in the upper and middle level lose their job, they can downgrade to the low-medium brakcet.
Brendan's prediction:
Extension of first-home boost will be annonced late May, and the first home buyer activity will peak when the first home buyers feels a relief from the urgency of buying soon. July & Aug 09 will be a period vacuum of buying activity, hence a good time to buy. The next opportunity is Dec 09.
Research Tips
Cosmetic renovation
Reno for renting is different from reno for selling!
$5000 rule for cosmetic renovation
As a rule of thumb, each small renovation of project costs around $5000. For example,
replaster the house, around $5000
rewiring $5000
kitchen $5000
bathroom $5000
floor $5000
etc,
So if you have a $15000 reno budget, you have to pick which 3 projects to do to maximise the end return.
Structural Reno
Fixed quotes are the best estimates (Not T&M). T&M places no urgency on tradies to get the job done.
Structural reno often involves big $, it's worth backing up the figure with a Quantity Surveyor's report.
Speak to "Extension" or "Renovation" specialists - cheaper than Architects.
Land Subdivision
1. Get start from Template 19, then contact
2. town planner in the council
- restrictions, overlays, provisions, etc
3.Contact a local or referred land surveyor
- Get a detailed Surveyor's report ($500-$1000).
Q: where can I find a sample of such report?
- Other local authorities:
4.Contact a local or Referred town planner
5. Council planning/authority:
- contribution levies (the biggest hidden cost)
- timing requirements (budget for delays)
- verification of the surveyor's report
6. Local Service Providers
- Power, Water, Sewer, Gas, Phone
Development
1. start from template 19
2. Local town planning consultant
- dertermine overall process
- quotes from different Service Providers : Power, Water, Sewer, Gas, Phone
- Architect
- Quantity Surveyor's report
3. Development companies
- Outsource the contruction project. Get fixed price quotes. Variation is a killer
- visit existing similar developments. Visit construction sites and speak with builder
4. Get estimates from cookie cutter builders
Property Prices
Get multiple opinions from multiple surces and draw your own conclusions:
1. Property reports on recent sales history for similar properties
- Australian Property Monitors: homepriceguide.com.au
- RP Data: myrp.com.au & rpdata.com.au
- Realestate.com.au Sold properties
- Realestate.com.au For Sale properties
- PDOL; consolidated membership works out about $141/quarter
- Basic reports - suburb history for 12 months $50 - $200
- API Magazine
- Title maps
Cross referencing all the above
2. The competition
- OFIs
- Reno quality
- Finished unit quality
- size of house/land
- Location
3. Real Estate Agents
- pretend I want to buy one, how much am I expected to pay for this sort of property?
(likely to get more realistic price with this approach)
- I want to sell one, get me reports
- I want to see one
4. Target market
- who am I selling to?
- what do they want?
- what's selling well?
- buyer's expectations?
5. where there is low sales history
No recent sales
-Review prior period
No comparative sales ata ll
-Review a different but similar type of location
-Be ware of pioneering = big risk
6.Unknown economic circumstances
-When will my project end?
-What's currently going on in the economy
* Media: Lateline on ABC, ABC radio 774
* hotspotting.com.au
7. Formal valuations:
Rental Due Diligence
1. Residential
- Property manager:
price vs condition vs location: supply!
number of vacancies? How long listed?
- Council : population trends, demographics
2. Commercial:
- Commercial property manager
- Council: Industrial developments in the area
- commerical trend
3. Population and Demographics:
- long servicing local agents
- council websites and ABS reports
4. Area income stability:
- what's the primary source of income for the area?
- increasing?stable? decreasing?
- RP Data, council websites, ABS reports
Town Planning
F.R. Perry & Associates
The most profitable way of development is by rezoning the site to a higher use zone, but it's a time consuming and requires large capital.
The 2nd most profitable way is by developing the land into multidwelling site.
DSE website : www.dpcd.vic.gov.au/planning
VCAT website: http://www.vcat.vic.gov.au/
Components of a planning scheme:
- state planning policy framework
- local planning policy framework
- zones
- overlays
- particular provisions
- general provisions
- definitions
- incorporated documents
- list of amendments
Zones: A zone controls land use and development.
Residential Zone considerations:
- the impact of new development o people's amenity
- compatibility with neighbourhood character.
Neighbourhood charactor is open to wide interpretation.
- subdivision design and housing respond to market demand
- compatibility with strategic planning objectives.
- the interface between residential and non-residential uses
Development of land includes the construction of a building, carrying out works (such as clearing vegetation), subdividing land or buildings, or displaying signs. the zones indicate whetehre a planning permit is required to construct a building or carry out works.
Some buildings and works, such as fences and underground services, usually do not require a permit.
Overlays (clauses 41 to 45) control development and are equally important to zones. Overlays apply to areas identified for strategic change or control of issues such as Heritage, Flooding and Design and Development.
There are 22 standby overlays:
-Land Management overlays
-Environmental Significance Overlays
-Special use Overlays
Overlays also have schedules that give distinct controls for particular locations.
Particular Provisons (clauses 51 to 56):
Other planning requirements such as advertising signs, car parking or specified type of use are listed under particular provisions.
It's essential to check whether any of these requirements apply to the land before comensing any use or development.
clauses 54, 55, 56 are particularly relevant to residential development and subdivision.
Incorpoerated Documents: the purpose si to add consideration to a particular issue that relates to the area and is to be read in conjunction with specified provisions to the planning scheme.
General provisons contains information on matters the council must consider before deciding on a proposal under this scheme.
Planing application
step one:
- use the planning scheme map to determine the zone and whether the land is covered by any overlays
- determine whether the use rquires a planning permit.
- determine whether the a planning permit is required for building and works.
Step two:
complete planning application form:
complete and assemble the supporting document including:
- plans
- traffic reports
- planning report
- architectural statement
- photos
- copy of the certificate of title
- submit to coucil
(Perry's firm will commission different people for these reports.)
step three:
- advertising, including notice on site, notification in writing, local newspaper
- submissions in reponses to advertising
- mediation meeting
- consideration by council
- decision by council
step four (if applicable) Planning appeals -VCAT
The following things can be appealed:
- decision to grant a permit
- decison to refuse a permit
- conditions on a permit
- a requirement to give notice of an application
- a requirement by the responsible authority for more information
- a decison of the responsible authority refusing to extend time
- a failure of the responsible authority to extend time
- a failure to grant a permit within the prescribed time
Building permits generally only relates to the construction aspect of a building or other developement.
A building permit is required in most cases involving development. A building surveyor shoul dbe consulted if any building is proposed. if a planning permit is required, it must be obtained before a building permit can be issued.